{"id":7029,"date":"2024-06-21T03:49:22","date_gmt":"2024-06-21T03:49:22","guid":{"rendered":"https:\/\/longchangchemical.com\/?p=7029"},"modified":"2026-04-28T10:42:30","modified_gmt":"2026-04-28T10:42:30","slug":"chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points","status":"publish","type":"post","link":"https:\/\/longchangchemical.com\/nl\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/","title":{"rendered":"Chemische installatie pre-commissioning, koppeling inbedrijfstelling veiligheid bedieningspunten"},"content":{"rendered":"<p><!-- lc-qa-start --><\/p>\n<p><strong>Quick answer:<\/strong> A strong printing-ink formulation is usually the one that keeps process stability and final print quality in balance, rather than over-optimizing only one part of the press behavior.<\/p>\n<p><!-- lc-qa-end --><\/p>\n<p>Chemische installatie pre-commissioning, koppeling inbedrijfstelling veiligheid bedieningspunten<\/p>\n<p>I. Druktest van het leidingsysteem<\/p>\n<p>1, De druktestvoorwaarden van het leidingsysteem<br \/>\na. Veiligheidskleppen zijn geblindeerd, breekplaten zijn verwijderd en geblindeerd.<\/p>\n<p>b. Dilatatievoegen zijn toegevoegd met begrenzers.<\/p>\n<p>c. Veersteunen en hangers zijn vergrendeld.<\/p>\n<p>d. Als de test wordt uitgevoerd met water als medium, is het draagvermogen van de constructie bevestigd of meegerekend<\/p>\n<p>e. Drukmeter is gekalibreerd en gekwalificeerd<\/p>\n<p>&nbsp;<\/p>\n<p>2, de druktest van het leidingsysteem zou aan de volgende bepalingen moeten voldoen<\/p>\n<p>a. Om media te luchten en te verwerken voor testen, afhankelijk van de ontwerpeenheid, stemde de productietechnologiesector in met<\/p>\n<p>b. V\u00f3\u00f3r de test bevestigen dat het testsysteem effectief is ge\u00efsoleerd van verwante systemen<\/p>\n<p>c. Hydraulische test, schoon vers water als testmedium, wanneer het systeem is aangesloten op austenitische roestvrijstalen apparatuur of leidingen, mag het chloorgehalte van het water niet hoger zijn dan 0,0025%<\/p>\n<p>d. De testtemperatuur moet hoger zijn dan de brosse overgangstemperatuur van het materiaal.<\/p>\n<p>e. Wanneer de test in het koude seizoen plaatsvindt, moeten er antivriesmaatregelen zijn<\/p>\n<p>f. De druktest van pijpleidingen moet in overeenstemming zijn met de relevante nationale normen en standaarden die vereist zijn<\/p>\n<p>g. Na het einde van de test, moet worden afgetapt van water, gas en goede reset werk<\/p>\n<p>&nbsp;<\/p>\n<p>II. Doorspoelen van water<\/p>\n<p>&nbsp;<\/p>\n<p>a. De druktest is gekwalificeerd, de systeemmachines, instrumentatie, kleppen en andere beschermende maatregelen zijn genomen, de tijdelijke installatie van het leidingwerk is voltooid, de spoelpomp draait normaal, de spoelpompinlaatinstallatie van het scherm v\u00f3\u00f3r de waterspoeling<\/p>\n<p>b. Spoelwerkzaamheden mogen niet worden uitgevoerd in het koude seizoen, zoals moeten anti-vries, anti-slip maatregelen<\/p>\n<p>c. Bij het vullen en aftappen moet het leidingsysteem worden aangesloten op de atmosfeer.<\/p>\n<p>d. In het voorafgaande proces van leidingen en mechanisch spoelen v\u00f3\u00f3r het passeren, mag spoelwater niet in het volgende proces terechtkomen.<\/p>\n<p>e. Spoelwater wordt op aangewezen plaatsen geloosd.<\/p>\n<p>f. Controleer na het spoelen of alle afvoer- en uitlaatpijpen vrij zijn.<\/p>\n<p>&nbsp;<\/p>\n<p>III. Inbedrijfstelling van het instrumentatiesysteem<\/p>\n<p>&nbsp;<\/p>\n<p>1, voorwaarden voor inbedrijfstelling van het instrumentatiesysteem<\/p>\n<p>a. Instrumentatieluchtstation met normale bedrijfsomstandigheden, instrumentatieluchtleidingsysteem is gespoeld gekwalificeerd<\/p>\n<p>b. Airconditioning in de controlekamer, ononderbreekbare stroomvoorziening kan normaal worden gebruikt<\/p>\n<p>c. Zenders, aanwijs- en registratie-instrumenten, vergrendelings- en alarmschakelaars, regelkleppen, alsmede op schijven en rekken gemonteerde instrumenten, enz.<\/p>\n<p>d. De parameters van de regelaar van het automatische controlesysteem zijn vooraf ingesteld, de parameters van de feed-forward regeling, de verhoudingswaarden en een verscheidenheid van het bias-systeem van de kaliberbepalingsverhouding zijn berekend en vooraf ingesteld volgens de relevante gegevens.<\/p>\n<p>e. Allerlei soorten apparaten voor het genereren van analoge signalen, testinstrumenten, standaard monstergas, communicatiehulpmiddelen enzovoort zijn voorbereid.<\/p>\n<p>f. Alle instrumenten en regelkleppen ter plaatse in werking zijn.<\/p>\n<p>&nbsp;<\/p>\n<p>2, moet de inbedrijfstelling van het instrumentatiesysteem voldoen aan de volgende bepalingen<\/p>\n<p>a. De opsporing en het automatische controlesysteem in combinatie met het mechanische testen zouden v\u00f3\u00f3r het zuiveren moeten worden gesimuleerd, dat wil zeggen, inputsignalen bij de zender, in de werkende lijst of secundaire instrumentatie om de instructies, de controle, het alarm en andere alle functies te controleren<\/p>\n<p>b. Vergrendelings- en alarmsystemen moeten worden gesimuleerd v\u00f3\u00f3r de test met de machines, dat wil zeggen, in de zenderschakelaar om analoge signalen in te voeren, de logica van de juiste en actie te controleren, en aangepast totdat ze gekwalificeerd zijn.<\/p>\n<p>c. Bij het debuggen en mechanisch afstemmen moeten instrumentatie, elektrotechniek en procesoperators nauw met elkaar samenwerken.<\/p>\n<p>d. Voor de eerste proef of onder belasting tijdelijk niet in gebruik kan worden genomen vergrendeling apparaten, de bouw (productie) eenheid overeengekomen, kan tijdelijk worden verwijderd, maar moet het alarmapparaat te behouden<\/p>\n<p>e. V\u00f3\u00f3r chemische het voeden proef, moet voeden voorwaartse controle, verhoudingscontrole en controlesysteem met corrector, volgens de lading en de daadwerkelijke materi\u00eble samenstelling, re-aanpassing van parameters<\/p>\n<p>&nbsp;<\/p>\n<p>IV. Inbedrijfstelling elektrisch systeem<\/p>\n<p>&nbsp;<\/p>\n<p>1, Inbedrijfstellingsvoorwaarden elektrisch systeem<\/p>\n<p>a. Het totale onderstation van alle installatiewerkzaamheden en foutopsporingsprojecten met betrekking tot de stroomvoorzieningsafdeling heeft de procedures voor het ontvangen van elektriciteit gecontroleerd, bevestigd en voltooid.<\/p>\n<p>b. Isolatieschakelaars, lastschakelaars, hoogspanningsschakelaars, schakelinrichtingen, transformatoren en andere primaire apparatuur zijn uitgevoerd en gekwalificeerd voor de overdrachtstest<\/p>\n<p>c. Relaisbeveiliging en andere secundaire apparatuur is getest en gekwalificeerd<\/p>\n<p>d. AC- en DC-bedrijfsvermogen debugging gekwalificeerd<\/p>\n<p>e. UPS en andere noodstroomvoorziening debugging gekwalificeerd<\/p>\n<p>f. Met testgegevens van de aardingsweerstand<\/p>\n<p>g. Met testgegevens van elektrische apparatuur<\/p>\n<p>h. Met test gekwalificeerde gegevens over vergrendelingsbeveiliging<\/p>\n<p>&nbsp;<\/p>\n<p>2, moet de inbedrijfstelling van elektrische systemen voldoen aan de volgende bepalingen<\/p>\n<p>a. Voedings- en distributiepersoneel moet een licentie hebben, strikte implementatie van het besturingssysteem<\/p>\n<p>b. Transformatoren en verdelers moeten door het systeem van stroom worden voorzien voordat de relaisbeveiligingen, automatische herafsluitingen, alarmen en simulatietests van het voorfasensysteem worden uitgevoerd.<\/p>\n<p>c. De programmeerbare logische controller beveiligingssysteem moet worden gesimuleerd vergrendeling en alarm parameters, moet de juistheid van de positieve alarmwaarde van de logica te controleren<\/p>\n<p>e. Moet worden uitgevoerd in het toevallige voedingssysteem van de proef en bevestiging<\/p>\n<p>f. Moet worden gebruikt in overeenstemming met de gespecificeerde procedures voor stroomuitval en stroomvoorziening<\/p>\n<p>g. De acceptatie van het elektrische systeem moet worden uitgevoerd voordat de stroom wordt geleverd.<\/p>\n<p>&nbsp;<\/p>\n<p>V. Vervanging van het systeem<\/p>\n<p>&nbsp;<\/p>\n<p>1. Voordat de chemische installatie in gebruik wordt genomen, moet deze worden gekwalificeerd met inert gasvervanging en systeemvervanging:<\/p>\n<p>a. Vervangende stroomdiagrammen die zijn gemarkeerd met luchtuitlaatpunten, analysepunten en blinde locaties<\/p>\n<p>b. De monsternemingsanalisten zijn op hun plaats, de analytische instrumenten en de geneesmiddelen zijn voorbereid.<\/p>\n<p>c. Inert gas kan voldoen aan de behoeften van het vervangingswerk<\/p>\n<p>&nbsp;<\/p>\n<p>2\u3001De voorwaarden voor vervanging van het systeem moeten voldoen aan de volgende bepalingen:<\/p>\n<p>a. Het zuurstofgehalte in het inerte gas mag niet hoger zijn dan de veiligheidsnorm.<\/p>\n<p>b. Bevestig dat de hoeveelheid, kwaliteit en installatieonderdelen van de jaloezie gekwalificeerd zijn.<\/p>\n<p>c. Vervanging moet aandacht besteden aan de dode ruimte in het systeem, indien nodig, kan herhaaldelijk worden genomen om de druk, drukontlasting methode om het gas te vervangen stimuleren<\/p>\n<p>d. Wanneer het leidingsysteem is aangesloten op de gaskast, moet de gaskast drie keer omhoog en omlaag worden gebracht om het gas in het ringvormige waterslot te vervangen.<\/p>\n<p>e. Vervangingswerkzaamheden moeten continu worden uitgevoerd in de volgorde van eerst de hoofdleiding en dan de aftakkende leiding.<\/p>\n<p>f. Analisten moeten bij het nemen van monsters letten op de windrichting en de hoogte en richting van de luchtuitlaatpijp om vergiftiging te voorkomen.<\/p>\n<p>g. De analysegegevens moeten drie opeenvolgende keren gekwalificeerd zijn en ondertekend worden door het personeel dat verantwoordelijk is voor productie, technologie en veiligheid.<\/p>\n<p>h. Vervanging is voltooid, de inert gas pijpleiding en het systeem om effectieve maatregelen te nemen om te isoleren.<\/p>\n<p><!-- lc-commercial-start --><\/p>\n<h2>How technical buyers usually evaluate printing-ink issues<\/h2>\n<p>Ink performance problems are often multi-variable problems. Teams generally move faster when they screen transfer, flow, drying or curing, and substrate hold together instead of changing one raw material at a time without a clear decision frame.<\/p>\n<ul>\n<li><strong>Define the real process bottleneck:<\/strong> poor transfer, drying problems, skinning, and color instability often need different corrective routes.<\/li>\n<li><strong>Check viscosity inside the print process:<\/strong> an ink that looks fine in the container can behave very differently on the machine.<\/li>\n<li><strong>Review substrate compatibility:<\/strong> paper, film, metalized surfaces, and laminates often require different balance points.<\/li>\n<li><strong>Use post-print checks as part of selection:<\/strong> scratch resistance, tape adhesion, lamination behavior, and storage stability are usually as important as the fresh-print appearance.<\/li>\n<\/ul>\n<h3>Recommended product references<\/h3>\n<ul>\n<li><strong><a href=\"https:\/\/longchangchemical.com\/nl\/product\/cas-270586-78-2\/\">CHLUMINIT TMO<\/a>:<\/strong> A valuable comparison point when lower yellowing or TPO-replacement discussions matter.<\/li>\n<li><strong><a href=\"https:\/\/longchangchemical.com\/nl\/product\/chlumiaf-094\/\">CHLUMIAF 094<\/a>:<\/strong> A balanced defoamer reference for waterborne coatings and many general foam-control screens.<\/li>\n<li><strong><a href=\"https:\/\/longchangchemical.com\/nl\/product\/chlumiaf-3037\/\">CHLUMIAF 3037<\/a>:<\/strong> A stronger process-defoaming option when persistent foam survives harsher conditions.<\/li>\n<li><strong><a href=\"https:\/\/longchangchemical.com\/nl\/product\/chlumiwe-3280\/\">CHLUMIWE 3280<\/a>:<\/strong> A strong wetting-agent reference for inks, coatings, and difficult substrate wetting.<\/li>\n<\/ul>\n<h3>FAQ for buyers and formulators<\/h3>\n<p><strong>Why do many ink problems require more than one formulation change?<\/strong><br \/>Because flow, transfer, drying, adhesion, and appearance interact, so improving one of them can sometimes worsen another if the full system is not reviewed together.<\/p>\n<p><strong>Should rheology be judged only by a single viscosity number?<\/strong><br \/>Not usually. Printability also depends on transfer behavior, temperature, shear history, and how the ink behaves on the actual press.<\/p>\n<p><!-- lc-commercial-end --><\/p>","protected":false},"excerpt":{"rendered":"<p>I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded. b. Expansion joints have been added with<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[106],"tags":[],"class_list":["post-7029","post","type-post","status-publish","format-standard","hentry","category-laboratory-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.3.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Chemical plant pre-commissioning, linkage commissioning safety operation points - Longchang Chemical<\/title>\n<meta name=\"description\" content=\"I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/longchangchemical.com\/nl\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Chemical plant pre-commissioning, linkage commissioning safety operation points - Longchang Chemical\" \/>\n<meta property=\"og:description\" content=\"I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/longchangchemical.com\/nl\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\" \/>\n<meta property=\"og:site_name\" content=\"Longchang Chemical\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-21T03:49:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-28T10:42:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/longchangchemical.com\/wp-content\/uploads\/2024\/02\/logo-jpeg.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Longchang Chemical\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\"},\"author\":{\"name\":\"Longchang Chemical\",\"@id\":\"https:\/\/longchangchemical.com\/#\/schema\/person\/ecb1ad846136c6f1ca534b62978c6a8e\"},\"headline\":\"Chemical plant pre-commissioning, linkage commissioning safety operation points\",\"datePublished\":\"2024-06-21T03:49:22+00:00\",\"dateModified\":\"2026-04-28T10:42:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\"},\"wordCount\":1389,\"publisher\":{\"@id\":\"https:\/\/longchangchemical.com\/#organization\"},\"articleSection\":[\"Laboratory News\"],\"inLanguage\":\"nl-NL\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\",\"url\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\",\"name\":\"Chemical plant pre-commissioning, linkage commissioning safety operation points - Longchang Chemical\",\"isPartOf\":{\"@id\":\"https:\/\/longchangchemical.com\/#website\"},\"datePublished\":\"2024-06-21T03:49:22+00:00\",\"dateModified\":\"2026-04-28T10:42:30+00:00\",\"description\":\"I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded...\",\"breadcrumb\":{\"@id\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/#breadcrumb\"},\"inLanguage\":\"nl-NL\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/longchangchemical.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Chemical plant pre-commissioning, linkage commissioning safety operation points\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/longchangchemical.com\/#website\",\"url\":\"https:\/\/longchangchemical.com\/\",\"name\":\"Longchang Chemical\",\"description\":\"China chemical manufacturer \uff06 supplier\",\"publisher\":{\"@id\":\"https:\/\/longchangchemical.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/longchangchemical.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl-NL\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/longchangchemical.com\/#organization\",\"name\":\"Longchang Chemical\",\"url\":\"https:\/\/longchangchemical.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\/\/longchangchemical.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/longchangchemical.com\/wp-content\/uploads\/2020\/08\/cropped-longchang-logo.png\",\"contentUrl\":\"https:\/\/longchangchemical.com\/wp-content\/uploads\/2020\/08\/cropped-longchang-logo.png\",\"width\":512,\"height\":512,\"caption\":\"Longchang Chemical\"},\"image\":{\"@id\":\"https:\/\/longchangchemical.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/longchangchemical.com\/#\/schema\/person\/ecb1ad846136c6f1ca534b62978c6a8e\",\"name\":\"Longchang Chemical\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl-NL\",\"@id\":\"https:\/\/longchangchemical.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c1e84ee0759373263198c58e8f338f80?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c1e84ee0759373263198c58e8f338f80?s=96&d=mm&r=g\",\"caption\":\"Longchang Chemical\"},\"sameAs\":[\"https:\/\/longchangchemical.com\"],\"url\":\"https:\/\/longchangchemical.com\/nl\/author\/infolongchangchemical-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Chemische installatie pre-commissioning, koppeling inbedrijfstelling veiligheid operatie punten - Longchang Chemical","description":"I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/longchangchemical.com\/nl\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/","og_locale":"nl_NL","og_type":"article","og_title":"Chemical plant pre-commissioning, linkage commissioning safety operation points - Longchang Chemical","og_description":"I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded...","og_url":"https:\/\/longchangchemical.com\/nl\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/","og_site_name":"Longchang Chemical","article_published_time":"2024-06-21T03:49:22+00:00","article_modified_time":"2026-04-28T10:42:30+00:00","og_image":[{"width":1000,"height":1000,"url":"https:\/\/longchangchemical.com\/wp-content\/uploads\/2024\/02\/logo-jpeg.jpg","type":"image\/jpeg"}],"author":"Longchang Chemical","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/#article","isPartOf":{"@id":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/"},"author":{"name":"Longchang Chemical","@id":"https:\/\/longchangchemical.com\/#\/schema\/person\/ecb1ad846136c6f1ca534b62978c6a8e"},"headline":"Chemical plant pre-commissioning, linkage commissioning safety operation points","datePublished":"2024-06-21T03:49:22+00:00","dateModified":"2026-04-28T10:42:30+00:00","mainEntityOfPage":{"@id":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/"},"wordCount":1389,"publisher":{"@id":"https:\/\/longchangchemical.com\/#organization"},"articleSection":["Laboratory News"],"inLanguage":"nl-NL"},{"@type":"WebPage","@id":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/","url":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/","name":"Chemische installatie pre-commissioning, koppeling inbedrijfstelling veiligheid operatie punten - Longchang Chemical","isPartOf":{"@id":"https:\/\/longchangchemical.com\/#website"},"datePublished":"2024-06-21T03:49:22+00:00","dateModified":"2026-04-28T10:42:30+00:00","description":"I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded...","breadcrumb":{"@id":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/#breadcrumb"},"inLanguage":"nl-NL","potentialAction":[{"@type":"ReadAction","target":["https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/longchangchemical.com\/"},{"@type":"ListItem","position":2,"name":"Chemical plant pre-commissioning, linkage commissioning safety operation points"}]},{"@type":"WebSite","@id":"https:\/\/longchangchemical.com\/#website","url":"https:\/\/longchangchemical.com\/","name":"Chemisch bedrijf Longchang","description":"China chemische fabrikant \uff06 leverancier","publisher":{"@id":"https:\/\/longchangchemical.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/longchangchemical.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl-NL"},{"@type":"Organization","@id":"https:\/\/longchangchemical.com\/#organization","name":"Chemisch bedrijf Longchang","url":"https:\/\/longchangchemical.com\/","logo":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/longchangchemical.com\/#\/schema\/logo\/image\/","url":"https:\/\/longchangchemical.com\/wp-content\/uploads\/2020\/08\/cropped-longchang-logo.png","contentUrl":"https:\/\/longchangchemical.com\/wp-content\/uploads\/2020\/08\/cropped-longchang-logo.png","width":512,"height":512,"caption":"Longchang Chemical"},"image":{"@id":"https:\/\/longchangchemical.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/longchangchemical.com\/#\/schema\/person\/ecb1ad846136c6f1ca534b62978c6a8e","name":"Chemisch bedrijf Longchang","image":{"@type":"ImageObject","inLanguage":"nl-NL","@id":"https:\/\/longchangchemical.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/c1e84ee0759373263198c58e8f338f80?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c1e84ee0759373263198c58e8f338f80?s=96&d=mm&r=g","caption":"Longchang Chemical"},"sameAs":["https:\/\/longchangchemical.com"],"url":"https:\/\/longchangchemical.com\/nl\/author\/infolongchangchemical-com\/"}]}},"_links":{"self":[{"href":"https:\/\/longchangchemical.com\/nl\/wp-json\/wp\/v2\/posts\/7029","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/longchangchemical.com\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/longchangchemical.com\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/longchangchemical.com\/nl\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/longchangchemical.com\/nl\/wp-json\/wp\/v2\/comments?post=7029"}],"version-history":[{"count":4,"href":"https:\/\/longchangchemical.com\/nl\/wp-json\/wp\/v2\/posts\/7029\/revisions"}],"predecessor-version":[{"id":9800,"href":"https:\/\/longchangchemical.com\/nl\/wp-json\/wp\/v2\/posts\/7029\/revisions\/9800"}],"wp:attachment":[{"href":"https:\/\/longchangchemical.com\/nl\/wp-json\/wp\/v2\/media?parent=7029"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/longchangchemical.com\/nl\/wp-json\/wp\/v2\/categories?post=7029"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/longchangchemical.com\/nl\/wp-json\/wp\/v2\/tags?post=7029"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}