{"id":7029,"date":"2024-06-21T03:49:22","date_gmt":"2024-06-21T03:49:22","guid":{"rendered":"https:\/\/longchangchemical.com\/?p=7029"},"modified":"2026-04-28T10:42:30","modified_gmt":"2026-04-28T10:42:30","slug":"chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points","status":"publish","type":"post","link":"https:\/\/longchangchemical.com\/fr\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/","title":{"rendered":"Pr\u00e9-commissionnement de l'usine chimique, points de fonctionnement de la s\u00e9curit\u00e9 de la mise en service des liaisons"},"content":{"rendered":"<p><!-- lc-qa-start --><\/p>\n<p><strong>Quick answer:<\/strong> A strong printing-ink formulation is usually the one that keeps process stability and final print quality in balance, rather than over-optimizing only one part of the press behavior.<\/p>\n<p><!-- lc-qa-end --><\/p>\n<p>Pr\u00e9-commissionnement de l'usine chimique, points de fonctionnement de la s\u00e9curit\u00e9 de la mise en service des liaisons<\/p>\n<p>I. Essai de pression du syst\u00e8me de tuyauterie<\/p>\n<p>1\u3001Conditions d'essai de pression du syst\u00e8me de tuyauterie<br \/>\na. Les soupapes de s\u00e9curit\u00e9 ont \u00e9t\u00e9 aveugl\u00e9es, les plaques de rupture ont \u00e9t\u00e9 retir\u00e9es et aveugl\u00e9es.<\/p>\n<p>b. Les joints de dilatation ont \u00e9t\u00e9 ajout\u00e9s avec des dispositifs de retenue.<\/p>\n<p>c. Les supports de ressorts et les suspensions sont verrouill\u00e9s.<\/p>\n<p>d. Lorsque l'essai est r\u00e9alis\u00e9 avec de l'eau comme milieu, la capacit\u00e9 portante de la structure a \u00e9t\u00e9 confirm\u00e9e ou prise en compte.<\/p>\n<p>e. Le manom\u00e8tre a \u00e9t\u00e9 \u00e9talonn\u00e9 et qualifi\u00e9<\/p>\n<p>&nbsp;<\/p>\n<p>2, l'essai de pression du syst\u00e8me de tuyauterie doit \u00eatre conforme aux dispositions suivantes<\/p>\n<p>a. Pour l'a\u00e9ration et le traitement des milieux \u00e0 tester, sous r\u00e9serve de l'unit\u00e9 de conception, le secteur des technologies de production s'est engag\u00e9 \u00e0<\/p>\n<p>b. Avant l'essai, confirmer que le syst\u00e8me d'essai a \u00e9t\u00e9 efficacement isol\u00e9 des syst\u00e8mes connexes.<\/p>\n<p>c. \u00c9preuve hydraulique : l'eau douce propre sert de milieu d'essai ; lorsque le syst\u00e8me est raccord\u00e9 \u00e0 un \u00e9quipement ou \u00e0 une tuyauterie en acier inoxydable aust\u00e9nitique, la teneur en chlore de l'eau ne doit pas d\u00e9passer 0,0025%.<\/p>\n<p>d. La temp\u00e9rature d'essai doit \u00eatre sup\u00e9rieure \u00e0 la temp\u00e9rature de transition fragile du mat\u00e9riau.<\/p>\n<p>e. Lorsque le test a lieu pendant la saison froide, des mesures antigel doivent \u00eatre prises.<\/p>\n<p>f. L'essai de pression des conduites doit \u00eatre conforme aux normes et standards nationaux pertinents requis.<\/p>\n<p>g. Apr\u00e8s la fin de l'essai, l'eau et le gaz doivent \u00eatre \u00e9vacu\u00e9s et le travail de remise \u00e0 z\u00e9ro doit \u00eatre effectu\u00e9 correctement.<\/p>\n<p>&nbsp;<\/p>\n<p>II. Rin\u00e7age \u00e0 l'eau<\/p>\n<p>&nbsp;<\/p>\n<p>a. L'essai de pression est qualifi\u00e9, les machines, l'instrumentation, les vannes et autres mesures de protection du syst\u00e8me ont \u00e9t\u00e9 prises, l'installation de la tuyauterie temporaire est termin\u00e9e, la pompe de rin\u00e7age fonctionne normalement, l'installation de l'entr\u00e9e de la pompe de rin\u00e7age du tamis avant le rin\u00e7age \u00e0 l'eau.<\/p>\n<p>b. Les travaux de rin\u00e7age ne doivent pas \u00eatre effectu\u00e9s pendant la saison froide ; ils doivent \u00eatre accompagn\u00e9s d'antigel et de mesures antid\u00e9rapantes.<\/p>\n<p>c. Lors du remplissage et de la vidange, la tuyauterie doit \u00eatre raccord\u00e9e \u00e0 l'atmosph\u00e8re.<\/p>\n<p>d. Dans le processus pr\u00e9c\u00e9dent de tuyauterie et de rin\u00e7age m\u00e9canique avant le passage, l'eau de rin\u00e7age ne doit pas p\u00e9n\u00e9trer dans le processus suivant.<\/p>\n<p>e. L'eau de rin\u00e7age doit \u00eatre d\u00e9vers\u00e9e dans des endroits pr\u00e9vus \u00e0 cet effet.<\/p>\n<p>f. Apr\u00e8s le rin\u00e7age, il convient de s'assurer que tous les tuyaux d'\u00e9vacuation et d'\u00e9chappement ne sont pas obstru\u00e9s.<\/p>\n<p>&nbsp;<\/p>\n<p>III. Mise en service du syst\u00e8me d'instrumentation<\/p>\n<p>&nbsp;<\/p>\n<p>1, conditions de mise en service du syst\u00e8me d'instrumentation<\/p>\n<p>a. La station d'air de l'instrumentation dans des conditions de fonctionnement normales, le syst\u00e8me de tuyauterie d'air de l'instrumentation a \u00e9t\u00e9 purg\u00e9.<\/p>\n<p>b. Climatisation de la salle de contr\u00f4le, l'alimentation \u00e9lectrique sans interruption peut \u00eatre utilis\u00e9e normalement.<\/p>\n<p>c. Les transmetteurs, les instruments d'indication et d'enregistrement, les interrupteurs de verrouillage et de signalisation d'alarme, les vannes de r\u00e9gulation, ainsi que les instruments mont\u00e9s sur disque ou sur b\u00e2ti, etc.<\/p>\n<p>d. Les param\u00e8tres du r\u00e9gulateur du syst\u00e8me de contr\u00f4le automatique ont \u00e9t\u00e9 pr\u00e9d\u00e9finis, les param\u00e8tres de contr\u00f4le en amont, les valeurs de rapport et une vari\u00e9t\u00e9 de syst\u00e8mes de biais de rapport d'\u00e9talonnage ont \u00e9t\u00e9 calcul\u00e9s et pr\u00e9d\u00e9finis en fonction des donn\u00e9es pertinentes.<\/p>\n<p>e. Toutes sortes de dispositifs de g\u00e9n\u00e9ration de signaux analogiques, d'instruments de test, de gaz d'\u00e9chantillonnage standard, d'outils de communication, etc. ont \u00e9t\u00e9 pr\u00e9par\u00e9s.<\/p>\n<p>f. Tous les instruments et vannes de contr\u00f4le du site sont op\u00e9rationnels.<\/p>\n<p>&nbsp;<\/p>\n<p>2, la mise en service du syst\u00e8me d'instrumentation doit \u00eatre conforme aux dispositions suivantes<\/p>\n<p>a. Le syst\u00e8me de d\u00e9tection et de contr\u00f4le automatique associ\u00e9 aux essais m\u00e9caniques doit \u00eatre simul\u00e9 avant le d\u00e9bogage, c'est-\u00e0-dire que les signaux d'entr\u00e9e au niveau du transmetteur, dans la table d'op\u00e9ration ou l'instrumentation secondaire doivent \u00eatre v\u00e9rifi\u00e9s pour contr\u00f4ler les instructions, le contr\u00f4le, l'alarme et d'autres fonctions.<\/p>\n<p>b. Les syst\u00e8mes de verrouillage et d'alarme doivent \u00eatre simul\u00e9s avant l'essai avec la machine, c'est-\u00e0-dire dans le commutateur du transmetteur pour entrer les signaux analogiques, v\u00e9rifier la logique de l'action correcte et ajuster jusqu'\u00e0 ce que la machine soit qualifi\u00e9e.<\/p>\n<p>c. Lors du d\u00e9bogage et de la mise au point m\u00e9canique de l'instrumentation, l'instrumentation, l'\u00e9lectricit\u00e9 et les op\u00e9rateurs de processus doivent travailler en \u00e9troite collaboration.<\/p>\n<p>d. Pour le premier essai ou en cas de charge temporaire, il n'est pas possible d'utiliser les dispositifs de verrouillage, l'unit\u00e9 de construction (production) est d'accord, ils peuvent \u00eatre temporairement enlev\u00e9s, mais le dispositif d'alarme doit \u00eatre conserv\u00e9.<\/p>\n<p>e. Avant l'essai d'alimentation chimique, le syst\u00e8me de contr\u00f4le de l'alimentation, le syst\u00e8me de contr\u00f4le du rapport et le syst\u00e8me de contr\u00f4le doivent \u00eatre dot\u00e9s d'un correcteur ; en fonction de la charge et de la composition r\u00e9elle du mat\u00e9riau, les param\u00e8tres doivent \u00eatre r\u00e9ajust\u00e9s.<\/p>\n<p>&nbsp;<\/p>\n<p>IV. Mise en service du syst\u00e8me \u00e9lectrique<\/p>\n<p>&nbsp;<\/p>\n<p>1\u3001Conditions de mise en service du syst\u00e8me \u00e9lectrique<\/p>\n<p>a. La sous-station totale de tous les travaux d'installation et projets de d\u00e9bogage li\u00e9s au d\u00e9partement de l'alimentation \u00e9lectrique a v\u00e9rifi\u00e9, confirm\u00e9 et achev\u00e9 les proc\u00e9dures de r\u00e9ception de l'\u00e9lectricit\u00e9.<\/p>\n<p>b. Les sectionneurs, les interrupteurs de charge, les disjoncteurs \u00e0 haute tension, l'appareillage de connexion, les transformateurs et les autres \u00e9quipements primaires ont \u00e9t\u00e9 r\u00e9alis\u00e9s et qualifi\u00e9s pour l'essai de transfert.<\/p>\n<p>c. Les relais de protection et autres \u00e9quipements secondaires ont \u00e9t\u00e9 test\u00e9s et qualifi\u00e9s.<\/p>\n<p>d. D\u00e9bogage de l'alimentation en courant alternatif et en courant continu qualifi\u00e9<\/p>\n<p>e. D\u00e9bogage qualifi\u00e9 des ASI et autres syst\u00e8mes d'alimentation de secours<\/p>\n<p>f. Avec les enregistrements des essais de r\u00e9sistance de mise \u00e0 la terre<\/p>\n<p>g. Avec les registres d'essais de l'\u00e9quipement \u00e9lectrique<\/p>\n<p>h. Avec enregistrement qualifi\u00e9 des essais de protection par interverrouillage<\/p>\n<p>&nbsp;<\/p>\n<p>2, la mise en service des syst\u00e8mes \u00e9lectriques doit \u00eatre conforme aux dispositions suivantes<\/p>\n<p>a. Le personnel charg\u00e9 de l'alimentation et de la distribution doit \u00eatre titulaire d'une licence et appliquer strictement le syst\u00e8me d'exploitation.<\/p>\n<p>b. Les transformateurs et les distributeurs doivent \u00eatre aliment\u00e9s par le syst\u00e8me avant les relais de protection, les dispositifs de r\u00e9enclenchement automatique, les alarmes et l'essai de simulation du syst\u00e8me de pr\u00e9phase.<\/p>\n<p>c. Le dispositif de protection de l'automate programmable doit simuler les param\u00e8tres de verrouillage et d'alarme, et v\u00e9rifier l'exactitude de la valeur d'alarme positive de sa logique.<\/p>\n<p>e. Le syst\u00e8me d'alimentation \u00e9lectrique en cas d'accident doit \u00eatre test\u00e9 et confirm\u00e9.<\/p>\n<p>f. Doit \u00eatre utilis\u00e9 conform\u00e9ment aux proc\u00e9dures sp\u00e9cifi\u00e9es en cas de coupure de courant et d'alimentation \u00e9lectrique.<\/p>\n<p>g. La r\u00e9ception du syst\u00e8me \u00e9lectrique doit \u00eatre effectu\u00e9e avant la mise sous tension.<\/p>\n<p>&nbsp;<\/p>\n<p>V. Remplacement du syst\u00e8me<\/p>\n<p>&nbsp;<\/p>\n<p>1. Avant que l'usine chimique ne soit mise en service, elle doit \u00eatre qualifi\u00e9e pour le remplacement du gaz inerte et les conditions de remplacement du syst\u00e8me :<\/p>\n<p>a. Organigrammes de remplacement marqu\u00e9s des points de d\u00e9gagement de l'air, des points d'analyse et des points aveugles.<\/p>\n<p>b. Les analystes charg\u00e9s de l'\u00e9chantillonnage ont \u00e9t\u00e9 mis en place, les instruments d'analyse et les m\u00e9dicaments ont \u00e9t\u00e9 pr\u00e9par\u00e9s.<\/p>\n<p>c. Le gaz inerte peut r\u00e9pondre aux besoins du travail de remplacement.<\/p>\n<p>&nbsp;<\/p>\n<p>2\u3001Les conditions de remplacement du syst\u00e8me doivent \u00eatre conformes aux dispositions suivantes :<\/p>\n<p>a. La teneur en oxyg\u00e8ne du gaz inerte ne doit pas \u00eatre sup\u00e9rieure \u00e0 la norme de s\u00e9curit\u00e9.<\/p>\n<p>b. Confirmer que la quantit\u00e9, la qualit\u00e9 et les \u00e9l\u00e9ments d'installation du store sont qualifi\u00e9s.<\/p>\n<p>c. Le remplacement doit tenir compte de l'espace mort dans le syst\u00e8me, si n\u00e9cessaire, il peut \u00eatre pris \u00e0 plusieurs reprises pour augmenter la pression, la m\u00e9thode de d\u00e9charge de pression pour remplacer le gaz.<\/p>\n<p>d. Lorsque le syst\u00e8me de tuyauterie est raccord\u00e9 \u00e0 l'armoire \u00e0 gaz, celle-ci doit \u00eatre soulev\u00e9e et abaiss\u00e9e trois fois pour remplacer le gaz dans le joint d'\u00e9tanch\u00e9it\u00e9 annulaire.<\/p>\n<p>e. Les travaux de remplacement doivent \u00eatre effectu\u00e9s en continu dans l'ordre suivant : d'abord la conduite principale, puis les conduites secondaires.<\/p>\n<p>f. Les analystes doivent faire attention \u00e0 la direction du vent ainsi qu'\u00e0 la hauteur et \u00e0 la direction du tuyau d'\u00e9vacuation de l'air lorsqu'ils pr\u00e9l\u00e8vent des \u00e9chantillons, afin d'\u00e9viter toute intoxication.<\/p>\n<p>g. Les donn\u00e9es d'analyse doivent \u00eatre qualifi\u00e9es trois fois de suite et sign\u00e9es par les responsables de la production, de la technologie et de la s\u00e9curit\u00e9.<\/p>\n<p>h. Le remplacement est termin\u00e9, le gazoduc inerte et le syst\u00e8me doivent prendre des mesures efficaces pour l'isoler.<\/p>\n<p><!-- lc-commercial-start --><\/p>\n<h2>How technical buyers usually evaluate printing-ink issues<\/h2>\n<p>Ink performance problems are often multi-variable problems. Teams generally move faster when they screen transfer, flow, drying or curing, and substrate hold together instead of changing one raw material at a time without a clear decision frame.<\/p>\n<ul>\n<li><strong>Define the real process bottleneck:<\/strong> poor transfer, drying problems, skinning, and color instability often need different corrective routes.<\/li>\n<li><strong>Check viscosity inside the print process:<\/strong> an ink that looks fine in the container can behave very differently on the machine.<\/li>\n<li><strong>Review substrate compatibility:<\/strong> paper, film, metalized surfaces, and laminates often require different balance points.<\/li>\n<li><strong>Use post-print checks as part of selection:<\/strong> scratch resistance, tape adhesion, lamination behavior, and storage stability are usually as important as the fresh-print appearance.<\/li>\n<\/ul>\n<h3>Recommended product references<\/h3>\n<ul>\n<li><strong><a href=\"https:\/\/longchangchemical.com\/fr\/product\/cas-270586-78-2\/\">CHLUMINIT TMO<\/a>:<\/strong> A valuable comparison point when lower yellowing or TPO-replacement discussions matter.<\/li>\n<li><strong><a href=\"https:\/\/longchangchemical.com\/fr\/product\/chlumiaf-094\/\">CHLUMIAF 094<\/a>:<\/strong> A balanced defoamer reference for waterborne coatings and many general foam-control screens.<\/li>\n<li><strong><a href=\"https:\/\/longchangchemical.com\/fr\/product\/chlumiaf-3037\/\">CHLUMIAF 3037<\/a>:<\/strong> A stronger process-defoaming option when persistent foam survives harsher conditions.<\/li>\n<li><strong><a href=\"https:\/\/longchangchemical.com\/fr\/product\/chlumiwe-3280\/\">CHLUMIWE 3280<\/a>:<\/strong> A strong wetting-agent reference for inks, coatings, and difficult substrate wetting.<\/li>\n<\/ul>\n<h3>FAQ for buyers and formulators<\/h3>\n<p><strong>Why do many ink problems require more than one formulation change?<\/strong><br \/>Because flow, transfer, drying, adhesion, and appearance interact, so improving one of them can sometimes worsen another if the full system is not reviewed together.<\/p>\n<p><strong>Should rheology be judged only by a single viscosity number?<\/strong><br \/>Not usually. Printability also depends on transfer behavior, temperature, shear history, and how the ink behaves on the actual press.<\/p>\n<p><!-- lc-commercial-end --><\/p>","protected":false},"excerpt":{"rendered":"<p>I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded. b. Expansion joints have been added with<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[106],"tags":[],"class_list":["post-7029","post","type-post","status-publish","format-standard","hentry","category-laboratory-news"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v25.3.1 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Chemical plant pre-commissioning, linkage commissioning safety operation points - Longchang Chemical<\/title>\n<meta name=\"description\" content=\"I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/longchangchemical.com\/fr\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\" \/>\n<meta property=\"og:locale\" content=\"fr_FR\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Chemical plant pre-commissioning, linkage commissioning safety operation points - Longchang Chemical\" \/>\n<meta property=\"og:description\" content=\"I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/longchangchemical.com\/fr\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\" \/>\n<meta property=\"og:site_name\" content=\"Longchang Chemical\" \/>\n<meta property=\"article:published_time\" content=\"2024-06-21T03:49:22+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-04-28T10:42:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/longchangchemical.com\/wp-content\/uploads\/2024\/02\/logo-jpeg.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1000\" \/>\n\t<meta property=\"og:image:height\" content=\"1000\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Longchang Chemical\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\"},\"author\":{\"name\":\"Longchang Chemical\",\"@id\":\"https:\/\/longchangchemical.com\/#\/schema\/person\/ecb1ad846136c6f1ca534b62978c6a8e\"},\"headline\":\"Chemical plant pre-commissioning, linkage commissioning safety operation points\",\"datePublished\":\"2024-06-21T03:49:22+00:00\",\"dateModified\":\"2026-04-28T10:42:30+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\"},\"wordCount\":1389,\"publisher\":{\"@id\":\"https:\/\/longchangchemical.com\/#organization\"},\"articleSection\":[\"Laboratory News\"],\"inLanguage\":\"fr-FR\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\",\"url\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\",\"name\":\"Chemical plant pre-commissioning, linkage commissioning safety operation points - Longchang Chemical\",\"isPartOf\":{\"@id\":\"https:\/\/longchangchemical.com\/#website\"},\"datePublished\":\"2024-06-21T03:49:22+00:00\",\"dateModified\":\"2026-04-28T10:42:30+00:00\",\"description\":\"I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded...\",\"breadcrumb\":{\"@id\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/#breadcrumb\"},\"inLanguage\":\"fr-FR\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/longchangchemical.com\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Chemical plant pre-commissioning, linkage commissioning safety operation points\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/longchangchemical.com\/#website\",\"url\":\"https:\/\/longchangchemical.com\/\",\"name\":\"Longchang Chemical\",\"description\":\"China chemical manufacturer \uff06 supplier\",\"publisher\":{\"@id\":\"https:\/\/longchangchemical.com\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/longchangchemical.com\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"fr-FR\"},{\"@type\":\"Organization\",\"@id\":\"https:\/\/longchangchemical.com\/#organization\",\"name\":\"Longchang Chemical\",\"url\":\"https:\/\/longchangchemical.com\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/longchangchemical.com\/#\/schema\/logo\/image\/\",\"url\":\"https:\/\/longchangchemical.com\/wp-content\/uploads\/2020\/08\/cropped-longchang-logo.png\",\"contentUrl\":\"https:\/\/longchangchemical.com\/wp-content\/uploads\/2020\/08\/cropped-longchang-logo.png\",\"width\":512,\"height\":512,\"caption\":\"Longchang Chemical\"},\"image\":{\"@id\":\"https:\/\/longchangchemical.com\/#\/schema\/logo\/image\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\/\/longchangchemical.com\/#\/schema\/person\/ecb1ad846136c6f1ca534b62978c6a8e\",\"name\":\"Longchang Chemical\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"fr-FR\",\"@id\":\"https:\/\/longchangchemical.com\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/c1e84ee0759373263198c58e8f338f80?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/c1e84ee0759373263198c58e8f338f80?s=96&d=mm&r=g\",\"caption\":\"Longchang Chemical\"},\"sameAs\":[\"https:\/\/longchangchemical.com\"],\"url\":\"https:\/\/longchangchemical.com\/fr\/author\/infolongchangchemical-com\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Points d'op\u00e9ration de s\u00e9curit\u00e9 avant la mise en service de l'usine chimique, pour la mise en service de la liaison - Longchang Chemical","description":"I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/longchangchemical.com\/fr\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/","og_locale":"fr_FR","og_type":"article","og_title":"Chemical plant pre-commissioning, linkage commissioning safety operation points - Longchang Chemical","og_description":"I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded...","og_url":"https:\/\/longchangchemical.com\/fr\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/","og_site_name":"Longchang Chemical","article_published_time":"2024-06-21T03:49:22+00:00","article_modified_time":"2026-04-28T10:42:30+00:00","og_image":[{"width":1000,"height":1000,"url":"https:\/\/longchangchemical.com\/wp-content\/uploads\/2024\/02\/logo-jpeg.jpg","type":"image\/jpeg"}],"author":"Longchang Chemical","twitter_card":"summary_large_image","schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/#article","isPartOf":{"@id":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/"},"author":{"name":"Longchang Chemical","@id":"https:\/\/longchangchemical.com\/#\/schema\/person\/ecb1ad846136c6f1ca534b62978c6a8e"},"headline":"Chemical plant pre-commissioning, linkage commissioning safety operation points","datePublished":"2024-06-21T03:49:22+00:00","dateModified":"2026-04-28T10:42:30+00:00","mainEntityOfPage":{"@id":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/"},"wordCount":1389,"publisher":{"@id":"https:\/\/longchangchemical.com\/#organization"},"articleSection":["Laboratory News"],"inLanguage":"fr-FR"},{"@type":"WebPage","@id":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/","url":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/","name":"Points d'op\u00e9ration de s\u00e9curit\u00e9 avant la mise en service de l'usine chimique, pour la mise en service de la liaison - Longchang Chemical","isPartOf":{"@id":"https:\/\/longchangchemical.com\/#website"},"datePublished":"2024-06-21T03:49:22+00:00","dateModified":"2026-04-28T10:42:30+00:00","description":"I. Piping system pressure test 1\u3001Piping system pressure test conditions a. Safety valves have been blinded, rupture plates have been removed and blinded...","breadcrumb":{"@id":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/#breadcrumb"},"inLanguage":"fr-FR","potentialAction":[{"@type":"ReadAction","target":["https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/longchangchemical.com\/chemical-plant-pre-commissioning-linkage-commissioning-safety-operation-points\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/longchangchemical.com\/"},{"@type":"ListItem","position":2,"name":"Chemical plant pre-commissioning, linkage commissioning safety operation points"}]},{"@type":"WebSite","@id":"https:\/\/longchangchemical.com\/#website","url":"https:\/\/longchangchemical.com\/","name":"Longchang Chemical","description":"Fabricant chinois de produits chimiques \uff06 fournisseur","publisher":{"@id":"https:\/\/longchangchemical.com\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/longchangchemical.com\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"fr-FR"},{"@type":"Organization","@id":"https:\/\/longchangchemical.com\/#organization","name":"Longchang Chemical","url":"https:\/\/longchangchemical.com\/","logo":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/longchangchemical.com\/#\/schema\/logo\/image\/","url":"https:\/\/longchangchemical.com\/wp-content\/uploads\/2020\/08\/cropped-longchang-logo.png","contentUrl":"https:\/\/longchangchemical.com\/wp-content\/uploads\/2020\/08\/cropped-longchang-logo.png","width":512,"height":512,"caption":"Longchang Chemical"},"image":{"@id":"https:\/\/longchangchemical.com\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/longchangchemical.com\/#\/schema\/person\/ecb1ad846136c6f1ca534b62978c6a8e","name":"Longchang Chemical","image":{"@type":"ImageObject","inLanguage":"fr-FR","@id":"https:\/\/longchangchemical.com\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/c1e84ee0759373263198c58e8f338f80?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/c1e84ee0759373263198c58e8f338f80?s=96&d=mm&r=g","caption":"Longchang Chemical"},"sameAs":["https:\/\/longchangchemical.com"],"url":"https:\/\/longchangchemical.com\/fr\/author\/infolongchangchemical-com\/"}]}},"_links":{"self":[{"href":"https:\/\/longchangchemical.com\/fr\/wp-json\/wp\/v2\/posts\/7029","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/longchangchemical.com\/fr\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/longchangchemical.com\/fr\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/longchangchemical.com\/fr\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/longchangchemical.com\/fr\/wp-json\/wp\/v2\/comments?post=7029"}],"version-history":[{"count":4,"href":"https:\/\/longchangchemical.com\/fr\/wp-json\/wp\/v2\/posts\/7029\/revisions"}],"predecessor-version":[{"id":9800,"href":"https:\/\/longchangchemical.com\/fr\/wp-json\/wp\/v2\/posts\/7029\/revisions\/9800"}],"wp:attachment":[{"href":"https:\/\/longchangchemical.com\/fr\/wp-json\/wp\/v2\/media?parent=7029"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/longchangchemical.com\/fr\/wp-json\/wp\/v2\/categories?post=7029"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/longchangchemical.com\/fr\/wp-json\/wp\/v2\/tags?post=7029"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}